Back
Business
-
Briefly
TIRUCHI: BHEL has secured an order worth Rs. 950 crore for setting up a 99 MW captive power plant on EPC (engineering, procurement and construction) basis. he power plant will be equipped with eco-friendly, state-of-the-art circulating fluidised bed combustion (CFBC) boilers, specifically designed to utilise petcoke fuel. Bharat Oman Refinery Ltd. (BORL) has placed the order on BHEL for setting up a 3 x 33 MW captive power plant at Bine in Madhya Pradesh.
© Copyright 2000 - 2009 The Hindu |